Loading...
Loading...
Browse all stories on DeepNewz
VisitWhich phase will the GÖKHAN missile project reach by the end of 2025?
Ground Testing • 25%
Flight Testing • 25%
Production • 25%
Deployment • 25%
Official announcements from TÜBİTAK SAGE or Ministry of National Defense
Turkey Unveils GÖKHAN Ramjet Air-to-Air Missile Developed by TÜBİTAK SAGE, Contract Signed May 21, 2021
Jan 1, 2025, 12:41 PM
Turkey has unveiled its first ramjet-powered air-to-air missile, named GÖKHAN. The development project for the GÖKHAN missile was initiated through a contract signed on May 21, 2021, between the Ministry of National Defense (MSB) and TÜBİTAK SAGE. The project aims to establish air superiority, protect high-value aerial assets, and enhance attack capabilities. The conceptual and preliminary design phases have been completed, and the project has now entered the ground testing phase, marking a significant advancement in Turkey's defense technology.
View original story
Fielding decision by the Army • 25%
Third successful live-fire test • 25%
No significant milestone • 25%
Deployment on Zumwalt-class destroyers • 25%
Miniaturization for smaller platforms • 25%
Increased power output • 25%
Other advancements • 25%
Integration with autonomous systems • 25%
Enhanced camouflage • 25%
Increased firing rate • 25%
Other upgrade • 25%
Extended range • 25%
Deployment to U.S. Army • 25%
No major milestone • 25%
New missile variant • 25%
Integration into Navy vessels • 25%
Production Phase • 25%
Testing Phase • 25%
Prototype Development • 25%
Operational Deployment • 25%
New advanced features • 25%
Other • 25%
Full-scale production • 25%
International collaboration • 25%
140 knots • 25%
170 knots or more • 25%
160 knots • 25%
150 knots • 25%
MUGEM Aircraft Carrier • 34%
MİLDEN Submarine • 33%
TF-2000 Destroyer • 33%
Air Superiority • 25%
Other • 25%
Attack Enhancement • 25%
Asset Protection • 25%