Loading...
Loading...
Browse all stories on DeepNewz
VisitWhat will be the first high-profile issue with chips from TSMC's Kaohsiung fab by December 31, 2025?
Yield issues • 25%
Performance issues • 25%
Power consumption issues • 25%
No reported issues • 25%
Industry reports or client announcements about chip defects
TSMC's Kaohsiung 2nm Fab, Six Months Ahead, Opens Dec. 1 with High-NA EUV Machines
Nov 26, 2024, 02:56 AM
Taiwan Semiconductor Manufacturing Company (TSMC) is advancing its 2nm semiconductor production capabilities with significant developments at its Kaohsiung facility in southern Taiwan. The company held a ceremony on November 26 to mark the installation of production equipment at its Fab P1, signaling the transition from construction to operational readiness. The Kaohsiung fab is reported to be six months ahead of schedule and is set to officially open on December 1, 2024. This facility follows TSMC's 2nm fab in Hsinchu, which began equipment installation in April. TSMC has also committed to utilizing high-NA EUV machines in its advanced manufacturing processes. The event was attended by clients, partners, and government officials, underscoring the strategic importance of the new facility in TSMC's roadmap for advanced semiconductor manufacturing.
View original story
Shipments resumed • 25%
Permanent halt • 25%
Resolution through legal means • 25%
No resolution by deadline • 25%
TSMC resumes shipments • 25%
New sanctions on TSMC • 25%
New sanctions on Huawei • 25%
No major developments • 25%
Below expectations • 25%
Meets expectations • 25%
Exceeds expectations • 25%
Significantly exceeds expectations • 25%
Yes • 50%
No • 50%
NVIDIA • 25%
AMD • 25%
Qualcomm • 25%
Other • 25%
Bosch • 25%
Infineon • 25%
NXP • 25%
Other • 25%
Resume production for China • 25%
Further restrictions • 25%
Diversify client base • 25%
No significant change • 25%
Increase U.S. compliance measures • 25%
Diversify customer base • 25%
Legal challenge to findings • 25%
No significant response • 25%
NVIDIA • 25%
Intel • 25%
Qualcomm • 25%
Other • 25%
Increase by over 20% • 25%
Increase by 10-20% • 25%
Increase by less than 10% • 25%
No significant change • 25%
No • 50%
Yes • 50%
Higher performance benchmarks • 25%
Other • 25%
Increased yield rates • 25%
Reduced power consumption • 25%