Loading...
Loading...
Browse all stories on DeepNewz
VisitWhat percentage of Gulf oil production will be restored by Dec 31, 2024?
Less than 75% • 25%
75% to 89% • 25%
90% to 99% • 25%
100% • 25%
Reports from the U.S. offshore energy regulator
Shell and Chevron Begin Redeploying Personnel to Gulf of Mexico Platforms as Oil and Gas Output Resumes Post-Hurricane Rafael
Nov 10, 2024, 08:35 PM
Shell and Chevron have begun redeploying personnel to their Gulf of Mexico platforms following Hurricane Rafael. The storm had previously led to the evacuation of personnel from 41 production platforms, representing 11.05% of the 371 manned platforms in the region. Approximately 28.01% of oil production and nearly 17% of natural gas output were shut in as a result of the hurricane. Shell had shut in its Salsa asset and moved non-essential personnel from several other platforms, including Appomattox, Vito, Ursa, Mars, and Auger, while Chevron also shut in production at its facilities and transported all associated personnel to shore. The U.S. offshore energy regulator reported that more than a quarter of the Gulf's oil output and 16% of its natural gas production were offline in the aftermath of the storm.
View original story
No impact • 25%
Reduced production • 25%
Temporary shutdown • 25%
Permanent shutdown • 25%
Yes • 50%
No • 50%
Less than 70% • 25%
70% to 84% • 25%
85% to 95% • 25%
More than 95% • 25%
Resumed to pre-halt levels • 25%
Resumed but below pre-halt levels • 25%
Still halted • 25%
Increased beyond pre-halt levels • 25%
0-25% • 25%
26-50% • 25%
51-75% • 25%
76-100% • 25%
Less than 50% • 25%
50% to 75% • 25%
75% to 90% • 25%
More than 90% • 25%
Restored to pre-blockade levels • 25%
Increased but below pre-blockade levels • 25%
No significant change • 25%
Further decreased • 25%
Minimal • 25%
Moderate • 25%
Severe • 25%
Catastrophic • 25%
Before June 2025 • 25%
No major disruption by end of 2025 • 25%
September to November 2025 • 25%
June to August 2025 • 25%