Loading...
Loading...
Browse all stories on DeepNewz
VisitWhat method will be used to resolve the Estlink 2 outage by February 28, 2025?
Repair • 25%
Replacement • 25%
Temporary Fix • 25%
Other • 25%
Official statement from Fingrid or Finnish government
Finland Investigates Estlink 2 Power Link Outage on December 25, 2024; Capacity Dropped from 1,016 MW to 358 MW
Dec 25, 2024, 01:25 PM
The undersea power link Estlink 2, which connects Finland and Estonia, experienced a significant outage on December 25, 2024. The disruption occurred around 12:30 PM local time, with Fingrid, the Finnish transmission system operator, confirming that the link's capacity dropped from 1,016 megawatts (MW) to just 358 MW. Finnish Prime Minister Petteri Orpo stated that authorities are actively investigating the cause of the outage, and while they are looking into various possibilities, including potential vandalism, the interruption is not expected to impact electricity supply for Finnish consumers. The investigation continues as officials work to determine the exact circumstances surrounding the outage.
View original story
Resolved with conviction • 25%
Closed without resolution • 25%
Ongoing investigation • 25%
Resolved without conviction • 25%
Sabotage confirmed • 25%
Natural causes • 25%
Inconclusive • 25%
Accidental damage • 25%
Sabotage • 25%
Accidental damage • 25%
Other • 25%
Technical failure • 25%
Accidental damage • 25%
Intentional sabotage • 25%
Natural causes • 25%
Undetermined • 25%
Inconclusive • 25%
Technical failure • 25%
Sabotage confirmed • 25%
Natural causes • 25%
Unknown/Other • 25%
Natural causes • 25%
Sabotage • 25%
Technical failure • 25%
Sabotage by another entity • 25%
Cause undetermined • 25%
Natural causes • 25%
Anchor damage by 'Eagle S' • 25%
Yes • 50%
No • 50%
Technical Failure • 25%
Vandalism • 25%
Natural Causes • 25%
Other • 25%