Loading...
Loading...
Browse all stories on DeepNewz
VisitHow effective will the four-layer filtration system be at Pithampur by end of 2025?
Highly effective • 25%
Moderately effective • 25%
Slightly effective • 25%
Ineffective • 25%
Central Pollution Control Board reports and environmental assessments
337 Metric Tons of Toxic Waste from Bhopal Gas Tragedy Moved in 12 Trucks for Disposal After 40 Years
Jan 2, 2025, 02:56 AM
Forty years after the 1984 Bhopal gas tragedy, Indian authorities have commenced the removal of 337 metric tons of toxic waste from the defunct Union Carbide factory site. The waste, stored at the site since the disaster, includes hazardous materials such as pesticide residues and chemicals that have long polluted the surrounding environment. The operation began on December 28, 2024, with the waste packed into 12 sealed, leak-proof, and fire-resistant containers. The convoy of 12 trucks departed Bhopal at 9:05 p.m. on January 1, 2025, under heavy security, traveling through a 250-kilometer green corridor to a disposal facility in Pithampur, Madhya Pradesh, with an expected arrival on January 2. The incineration process at the Pithampur facility, overseen by the Central Pollution Control Board, is expected to take three to nine months, depending on initial testing results. The operation follows a December 2024 Madhya Pradesh High Court order mandating the waste's removal within four weeks, citing decades of inaction. Local residents and activists near the disposal site have expressed concerns about potential environmental and health risks, despite assurances from authorities regarding stringent safety measures, including a four-layer filtration system. The tragedy, caused by a methyl isocyanate gas leak, killed over 5,000 people immediately and left long-lasting health and environmental impacts.
View original story
Generally negative • 25%
Unchanged from before incineration • 25%
Generally positive • 25%
Mixed opinions • 25%
No official response • 25%
Immediate cleanup and mitigation • 25%
Investigation and monitoring • 25%
Denial of contamination • 25%
Yes • 50%
No • 50%
Complete and safe • 25%
Complete with minor issues • 25%
Incomplete due to technical issues • 25%
Halted due to protests or legal action • 25%
Increase in surveillance only • 25%
Public health campaign • 25%
No significant measures • 25%
Vaccination drive • 25%
Disaster Mitigation • 25%
Economic Growth • 25%
Pollution Reduction • 25%
Water Conservation • 25%
Site closure • 25%
Partial resolution, limited production • 25%
Issue resolved and production resumes • 25%
Issue unresolved, production halted • 25%
No • 50%
Yes • 50%
No • 50%
Yes • 50%
National protests • 25%
Statewide protests • 25%
No significant protests • 25%
Local protests only • 25%