Loading...
Loading...
Browse all stories on DeepNewz
VisitWhat will be the outcome of the Union Carbide waste incineration by October 31, 2025?
Complete and safe • 25%
Complete with minor issues • 25%
Incomplete due to technical issues • 25%
Halted due to protests or legal action • 25%
Final reports from Central Pollution Control Board and State Pollution Control Board
India Transports 337 Tonnes of Union Carbide's Toxic Waste to Pithampur for Incineration 40 Years After Bhopal Gas Tragedy
Jan 2, 2025, 06:15 AM
Forty years after the catastrophic Bhopal gas tragedy, Indian authorities have completed the removal of 337 tonnes of toxic waste from the defunct Union Carbide factory in Bhopal. The waste, comprising 60% mud and 40% naphthol used in the production of pesticide methyl isocyanate, was transported in 12 sealed container trucks to Pithampur, located 250 km away, for incineration. The operation, which began on Wednesday night, involved a green corridor and heavy security measures. Madhya Pradesh Chief Minister Mohan Yadav has assured that the disposal process will not harm the environment, citing scientific studies and the use of safe technology. The waste is expected to be incinerated over a period of three to nine months, with the smoke passing through special four-layer filters to prevent air pollution. Once confirmed safe, the ash will be covered by a two-layer membrane and buried to avoid contact with soil and water. The process will be closely monitored by experts from the Central Pollution Control Board and State Pollution Control Board. Despite these assurances, there have been protests in Pithampur against the disposal plan, with concerns raised about potential contamination of soil and water. The highly toxic methyl isocyanate gas leak from the Union Carbide factory in 1984 resulted in 5,479 immediate deaths and long-term health issues for thousands. The disposal follows directions from the Supreme Court.
View original story
Safe for incineration • 25%
Not suitable for current facility • 25%
Testing inconclusive • 25%
Requires additional treatment • 25%
Other outcomes • 25%
No legal action • 25%
ZSR executives charged • 25%
ZSR fined • 25%
Minor environmental damage • 25%
No environmental damage • 25%
Assessment inconclusive • 25%
Significant environmental damage • 25%
Pending further investigation • 25%
Inconclusive results • 25%
Safety violations found • 25%
No safety violations found • 25%
Yes • 50%
No • 50%
Local protests only • 25%
Statewide protests • 25%
No significant protests • 25%
National protests • 25%
Yes • 50%
No • 50%
Yes • 50%
No • 50%
Non-compliant • 25%
Found compliant • 25%
Minor compliance issues • 25%
Major compliance issues • 25%
Boiler malfunction • 25%
Other • 25%
Human error • 25%
Gas leak • 25%
Issue resolved and production resumes • 25%
Issue unresolved, production halted • 25%
Partial resolution, limited production • 25%
Site closure • 25%
Yes • 50%
No • 50%
Immediate cleanup and mitigation • 25%
No official response • 25%
Denial of contamination • 25%
Investigation and monitoring • 25%